Dubai Telegraph - Bad day in space: Moon mission fails and NASA program delayed

EUR -
AED 4.250766
AFN 72.908308
ALL 96.082221
AMD 436.873271
ANG 2.071606
AOA 1061.215153
ARS 1597.838385
AUD 1.645756
AWG 2.085976
AZN 1.97195
BAM 1.955467
BBD 2.330193
BDT 141.96215
BGN 1.978129
BHD 0.433607
BIF 3437.085868
BMD 1.157268
BND 1.479667
BOB 7.994742
BRL 6.149843
BSD 1.156998
BTN 108.163052
BWP 15.776518
BYN 3.510218
BYR 22682.452195
BZD 2.326894
CAD 1.587483
CDF 2632.785049
CHF 0.912279
CLF 0.0272
CLP 1074.002997
CNY 7.969415
CNH 7.992203
COP 4296.46149
CRC 540.405658
CUC 1.157268
CUP 30.667601
CVE 110.924591
CZK 24.475107
DJF 205.670119
DKK 7.473526
DOP 68.279225
DZD 152.783891
EGP 59.986564
ERN 17.35902
ETB 181.865115
FJD 2.562713
FKP 0.866861
GBP 0.867431
GEL 3.142029
GGP 0.866861
GHS 12.620054
GIP 0.866861
GMD 85.063652
GNF 10157.924053
GTQ 8.862453
GYD 242.061925
HKD 9.063434
HNL 30.737487
HRK 7.53787
HTG 151.782191
HUF 393.182241
IDR 19627.264756
ILS 3.598091
IMP 0.866861
INR 108.614171
IQD 1516.02104
IRR 1522530.672291
ISK 143.814137
JEP 0.866861
JMD 181.768268
JOD 0.820549
JPY 184.278148
KES 149.986328
KGS 101.200658
KHR 4640.644962
KMF 494.153828
KPW 1041.484287
KRW 1742.741851
KWD 0.354823
KYD 0.964148
KZT 556.232895
LAK 24863.90272
LBP 103633.347039
LKR 360.916993
LRD 212.214059
LSL 19.685569
LTL 3.417112
LVL 0.70002
LYD 7.38381
MAD 10.832611
MDL 20.148831
MGA 4825.807832
MKD 61.713417
MMK 2430.000094
MNT 4131.070323
MOP 9.33887
MRU 46.441602
MUR 53.81729
MVR 17.8918
MWK 2010.174862
MXN 20.713597
MYR 4.558523
MZN 73.953739
NAD 19.477256
NGN 1569.545119
NIO 42.495316
NOK 11.075049
NPR 173.060536
NZD 1.982642
OMR 0.441597
PAB 1.157018
PEN 4.02618
PGK 4.989851
PHP 69.404876
PKR 323.1135
PLN 4.275585
PYG 7556.680787
QAR 4.217668
RON 5.093719
RSD 117.69304
RUB 95.988502
RWF 1688.453967
SAR 4.345607
SBD 9.317929
SCR 16.627341
SDG 695.518442
SEK 10.812706
SGD 1.484085
SHP 0.868251
SLE 28.439904
SLL 24267.343207
SOS 661.382882
SRD 43.383087
STD 23953.110446
STN 24.89862
SVC 10.123276
SYP 128.185157
SZL 19.477247
THB 37.962609
TJS 11.112752
TMT 4.062011
TND 3.366536
TOP 2.786423
TRY 51.244872
TTD 7.84963
TWD 37.032963
TZS 2993.463438
UAH 50.684352
UGX 4373.236539
USD 1.157268
UYU 46.622062
UZS 14112.88327
VES 526.198902
VND 30450.034804
VUV 137.756939
WST 3.175735
XAF 655.853838
XAG 0.017004
XAU 0.000257
XCD 3.127575
XCG 2.085136
XDR 0.816864
XOF 660.225535
XPF 119.331742
YER 276.128291
ZAR 19.821112
ZMK 10416.804592
ZMW 22.590447
ZWL 372.639814
  • RBGPF

    -13.5000

    69

    -19.57%

  • CMSC

    -0.2000

    22.65

    -0.88%

  • GSK

    -0.5300

    51.84

    -1.02%

  • BP

    -1.0800

    44.78

    -2.41%

  • RIO

    -2.5000

    83.15

    -3.01%

  • NGG

    -3.5400

    81.99

    -4.32%

  • RELX

    -0.4600

    33.36

    -1.38%

  • BTI

    -1.3500

    57.37

    -2.35%

  • RYCEF

    -1.3000

    15.3

    -8.5%

  • AZN

    -5.3300

    183.6

    -2.9%

  • CMSD

    -0.2420

    22.658

    -1.07%

  • JRI

    -0.3900

    11.77

    -3.31%

  • BCC

    -1.5600

    68.3

    -2.28%

  • VOD

    -0.0900

    14.33

    -0.63%

  • BCE

    0.0600

    25.79

    +0.23%

Bad day in space: Moon mission fails and NASA program delayed

Bad day in space: Moon mission fails and NASA program delayed

A private US lunar lander mission is doomed to fail, and NASA pushes back plans to return astronauts to the Moon.

Text size:

The twin developments Tuesday represent blows to America's ambitions to stimulate a commercial space economy, develop a lasting presence on Earth's nearest neighbor, and use it as a jump off point for Mars.

China meanwhile is looming in the rear view mirror, targeting 2030 for a crewed landing.

Astrobotic's Peregrine Lunar Lander blasted off Monday from Florida's Cape Canaveral Space Force Station, then successfully separated from its rocket.

Just hours later, though, Astrobotic reported an inability to orient Peregrine's solar panel towards the Sun and keep its battery topped up. A propulsion system glitch was found to be causing a critical loss of fuel and damaging the spacecraft's exterior.

The company said Monday the mission had "no chance of soft landing" -- dashing hopes for the first ever successful landing by a non-government mission, and America's first soft touchdown on the Moon since Apollo 17 in 1972.

NASA has paid Astrobotic more than $100 million to ship scientific hardware to the Moon to answer questions about surface composition and radiation, as the US space agency prepares to send astronauts back for long term missions.

The failure doesn't mean the strategy of ramping up commercial partnerships is innately flawed, Michael Lembeck, a former NASA official turned associate professor in aerospace engineering at the University of Illinois told AFP.

"It's a balance of making progress versus accepting risk -- and I think in the long term these failures are just as informative success," he said, adding NASA's contracts with other companies, including Houston-based Intuitive Machines, which will attempt to launch a lander next month, helped spread such risks.

- Artemis safety issues -

But, further spoiling the mood for space watchers, NASA Administrator Bill Nelson announced the agency was pushing back its planned return of astronauts to the lunar surface from December 2025 to September 2026, citing safety issues with the Orion crew capsule.

And few analysts believe the new date for American boots on the Moon is credible.

In a briefing Tuesday, NASA officials went into new detail about concerns linked to the Orion capsule built by Lockheed Martin.

First, the uncrewed Artemis 1 mission revealed the heat shield lost some of its material during its fiery reentry to the atmosphere.

Second, a design flaw has been uncovered during new testing in Orion's ability to open and shut valves connected to the life support system -- described by Amit Kshatriya, deputy associate administrator for the Moon to Mars program -- as "unacceptable."

Third, when engineers put the vehicle under stress testing to simulate an emergency ejection from the Space Launch Systems (SLS) rocket, they found a battery became disconnected, meaning Orion might not be able to maintain power as it floats back to the ground.

- SpaceX complications -

While it's back to the drawing board for Orion, its issues are dwarfed by the fact that the Artemis 3 lander, a modified version of SpaceX's next-gen Starship rocket, is nowhere near ready, having exploded in its two orbital test flights to date.

Even once Starship stops blowing up, SpaceX will have to succeed in its own uncrewed lunar landing ahead of Artemis 3.

Its complex plans involve launching a spaceship to serve as a fuel depot, having 10 more Starships launch and fuel up the depot, then having yet another Starship collect that fuel and journey to the Moon, where it would dock with an Orion capsule and fly down to the surface.

Given these constraints, the new deadline is far from realistic, said Lembeck, stressing that compared to the Apollo years, NASA is working to a much tighter budget, in a more risk-averse era, without a national imperative to beat the Soviet Union.

V.Munir--DT