Dubai Telegraph - Kenya, Uganda open rail extension burdened by Chinese debt

EUR -
AED 4.180966
AFN 72.281788
ALL 94.236629
AMD 419.464886
ANG 2.038011
AOA 1043.819048
ARS 1674.139709
AUD 1.645771
AWG 2.050358
AZN 1.938024
BAM 1.956569
BBD 2.297093
BDT 140.115077
BGN 1.924725
BHD 0.429183
BIF 3397.817884
BMD 1.138297
BND 1.477481
BOB 7.898105
BRL 5.91698
BSD 1.140543
BTN 107.984447
BWP 15.509096
BYN 3.203259
BYR 22310.629991
BZD 2.293802
CAD 1.616895
CDF 2582.796654
CHF 0.921679
CLF 0.026434
CLP 1040.369583
CNY 7.729612
CNH 7.735482
COP 3903.802483
CRC 517.396563
CUC 1.138297
CUP 30.164882
CVE 110.308361
CZK 24.214945
DJF 202.297724
DKK 7.475103
DOP 66.755361
DZD 152.103828
EGP 56.581581
ERN 17.074462
ETB 183.875471
FJD 2.553997
FKP 0.859276
GBP 0.862062
GEL 3.010836
GGP 0.859276
GHS 12.802032
GIP 0.859276
GMD 83.095791
GNF 9993.44542
GTQ 8.70142
GYD 238.613796
HKD 8.925334
HNL 30.514861
HRK 7.535648
HTG 149.118616
HUF 355.672343
IDR 20440.976432
ILS 3.410704
IMP 0.859276
INR 108.284533
IQD 1494.087304
IRR 1565158.992122
ISK 143.983202
JEP 0.859276
JMD 179.529782
JOD 0.807046
JPY 183.842978
KES 147.352771
KGS 99.544494
KHR 4577.377071
KMF 490.606213
KPW 1024.468102
KRW 1743.518623
KWD 0.351689
KYD 0.950474
KZT 554.788079
LAK 25256.928139
LBP 102133.84736
LKR 381.589998
LRD 207.571593
LSL 18.807593
LTL 3.361096
LVL 0.688544
LYD 7.318845
MAD 10.674696
MDL 20.078893
MGA 4764.873004
MKD 61.650549
MMK 2389.727291
MNT 4073.966585
MOP 9.210521
MRU 45.300414
MUR 54.593053
MVR 17.598261
MWK 1977.668706
MXN 19.986343
MYR 4.712889
MZN 72.737681
NAD 18.807593
NGN 1558.436413
NIO 41.966496
NOK 11.109465
NPR 172.774156
NZD 2.005811
OMR 0.437659
PAB 1.140548
PEN 3.860718
PGK 5.001988
PHP 70.050556
PKR 317.20809
PLN 4.280255
PYG 6952.702468
QAR 4.157634
RON 5.247437
RSD 117.380119
RUB 84.803037
RWF 1672.550109
SAR 4.274638
SBD 9.180415
SCR 15.236117
SDG 683.551122
SEK 11.087478
SGD 1.475465
SHP 0.849854
SLE 28.172588
SLL 23869.532518
SOS 651.853371
SRD 42.666816
STD 23560.458971
STN 24.50845
SVC 9.979923
SYP 125.818405
SZL 18.801391
THB 37.825158
TJS 10.578358
TMT 3.995424
TND 3.376027
TOP 2.740748
TRY 52.895655
TTD 7.744044
TWD 36.076858
TZS 2988.02854
UAH 51.196925
UGX 4174.640992
USD 1.138297
UYU 45.747983
UZS 13703.386606
VES 702.176169
VND 29965.680332
VUV 135.182527
WST 3.137518
XAF 656.212065
XAG 0.018479
XAU 0.000277
XCD 3.076306
XCG 2.055508
XDR 0.816121
XOF 656.212065
XPF 119.331742
YER 271.65506
ZAR 18.800009
ZMK 10246.030928
ZMW 20.460043
ZWL 366.531314
  • RBGPF

    -0.2700

    60.34

    -0.45%

  • CMSC

    -0.0500

    22.11

    -0.23%

  • CMSD

    -0.1200

    21.96

    -0.55%

  • BCC

    -0.7400

    71.8

    -1.03%

  • JRI

    -0.0200

    12.63

    -0.16%

  • RYCEF

    0.2300

    18.63

    +1.23%

  • NGG

    0.6000

    81.57

    +0.74%

  • RELX

    0.3800

    31.21

    +1.22%

  • RIO

    -3.7800

    95.58

    -3.95%

  • BCE

    0.3900

    23.04

    +1.69%

  • VOD

    -0.0700

    14.05

    -0.5%

  • GSK

    1.3300

    52.07

    +2.55%

  • AZN

    4.5900

    181.02

    +2.54%

  • BP

    -0.4500

    39.33

    -1.14%

  • BTI

    1.8400

    60.74

    +3.03%

Kenya, Uganda open rail extension burdened by Chinese debt
Kenya, Uganda open rail extension burdened by Chinese debt / Photo: SIMON MAINA - AFP/File

Kenya, Uganda open rail extension burdened by Chinese debt

The presidents of Kenya and Uganda met near their shared border Saturday to mark the multi-billion-dollar, long-delayed extension of a Chinese-built railway that has left Kenya heavily in debt.

Text size:

The Standard Gauge Railway, built from 2013 to 2019, connects the Kenyan port of Mombasa to its capital Nairobi, and on to the lake town of Naivasha, but China refused further lending before it could be extended to Uganda as planned.

Kenya now spends roughly $1 billion a year servicing Chinese debt, most of it borrowed to build the railway.

That is far more than the line generates in revenue -- around $165 million last year -- even if passenger and cargo numbers have been growing strongly over the past year.

A report by Kenya's auditor general last year found more than $260 million had been wasted just on penalties and interest from late debt payments.

Yet despite the controversy over the cost, Kenya has been keen to finish the line.

Kenyan President William Ruto said the rail link will "define generations", speaking at a ceremony in grand pomp and circumstance with his Ugandan counterpart Yoweri Museveni in Kisumu, near the Kenya-Uganda border.

Ruto argued the line would slash logistics costs that "undermine competitiveness" in east Africa.

If the ambitious building schedule is to be believed, the line is due to reach Kisumu by June 2027. The next phase will then take the line to Malaba, a town on the border.

"Cargo takes an average of 80 hours to move from Mombasa to Malaba and more than 100 hours to reach Kampala," the Ugandan capital, Ruto said.

"We cannot build prosperity on inefficiency."

- 'Irrational and wasteful' -

Museveni said the line would reduce the inefficiencies in his own country's infrastructure.

"The railway is part of the rationalisation of our transport system, especially on the Uganda side, which is irrational and wasteful," the veteran leader told the ceremony.

Ruto broke ground on the next phase in Narok County on Thursday, arguing that it will create jobs and reduce road congestion.

"We have thought through this project (and)... its finance," he insisted.

Treasury estimates say the overall cost will be more than 500 billion shillings ($3.9 billion), according to Kenya's Business Daily.

Kenya is not taking more cash from Chinese banks this time -- instead borrowing against future cargo taxes -- though it is partnering with Chinese transport firms to build the new phase.

China lent Kenya $9.7 billion between 2000 and 2019, according to the Chinese Loans to Africa Database by Boston University, with around half of that going to the railway.

It stopped lending from 2020 to 2023 as Kenya struggled to make repayments, at a time when China revised its broader lending strategy in Africa.

Kenya considers the railway extension crucial for strengthening trade through east and central Africa, hoping to reach landlocked countries such as Uganda, Rwanda, South Sudan and the mineral-rich Democratic Republic of Congo.

T.Jamil--DT